Our Cases

  • HK Construction Site Energy Storage

    HK Construction Site Energy Storage

    500kW / 511kWh
    HK Construction Site Energy Storage
  • 24.08MWh Industrial Energy Storage

    The project is located in the northern region of China, with an equipment footprint of 150m². The application scenario is peak shaving and valley filling for an industrial park. Based on local policies, the project is expected to generate an annual revenue of over 4 million yuan for the client, achieving a carbon reduction of approximately 4,000 tons per year. 

    24.08MWh Industrial Energy Storage

    8MW / 24MWh
    24.08MWh Industrial Energy Storage
  • Henan Jiaozuo energy storage power station

    Medium voltage grid-connected industrial and commercial energy storage system, for enterprises to achieve peak and valley arbitrage, demand management, stable supply, to achieve stable production, save electricity costs.

    Henan Jiaozuo energy storage power station

    3MW / 6.0MWh
    cn
  • Guangdong Solar Storage and Charging Power Station

    The consumption of renewable energy can not only provide electric energy supply for electric vehicles, alleviate the impact on the grid, but also realize the auxiliary service functions of the grid such as peak cutting and valley filling, and improve the operation efficiency of the grid.

    Guangdong Solar Storage and Charging Power Station

    300kW / 600kWh
    Guangdong Solar Storage and Charging Power Station
  • Zero-Carbon Factory Project

    The Hunan Shaoyang Zero-Carbon Industrial Park Project, powered by Gooree’s energy storage system and intelligent EMS, integrates wind, solar, and storage to achieve true zero-carbon manufacturing. The project boosts renewable utilization, stabilizes on-site power, and provides a replicable model for green industrial parks.

    Zero-Carbon Factory Project

    1MW / 2MWh
    Zero-Carbon Factory Project
  • Dongguan PV-ESS-Charger integrated system

    1MW solar + 2.15MWh energy storage + smart charging integrated solution at Dongguan East Coach Station, transforming the site into a green, efficient energy hub. The system—built on GR215L storage cabinets and the Gooree EMS—enables peak shaving, smart power scheduling, and higher energy utilization, providing a scalable model for urban charging infrastructure upgrades.

    Dongguan PV-ESS-Charger integrated system

    1MW / 2.15MWh
    Dongguan PV-ESS-Charger integrated system
© 2024 Shenzhen Gooree Energy Storage Technology Co., Ltd ICP:2022152546 Disclaimer Privacy agreement SiteMap